🚢 Ship-to-Shore (STS) Crane Network Diagnostics Workstation

Interactive physical & logic topology: WAN highline AP, LTE failover, Cisco core switch, ABB OCR, and PoE camera endpoints.

STS CRANE NETWORK PROTOCOL: The onboard Cisco core switch is the local backbone. If the switch drops offline or loses power, external uplinks may remain up, but all local OCR servers and camera endpoints drop simultaneously.

Network Topology Map (Click Wire Letters or Switch Box to Cut)

LAYER 1: EXTERNAL INGRESS & WAN REDUNDANCY LAYER 2 & 3: CORE DISTRIBUTION (CISCO LAN) & OCR SERVERS LAYER 4: EDGE POE INJECTION & MATCHMAKER CAMERAS A B C D E F Primary Access Point Highline Point-to-Point (GI Link) LTE Cradlepoint Secondary Failover Uplink Cisco Core Switch Click to Trip Power / LAN ABB OCR Server Character & Job Processing PoE Injector Bank DC Power + Data Injection OCR Cameras (Spreader & Legs) ISO Container & Chassis Capture Matchmaker Optical Cameras Truck Roof QR Sticker Capture

Fault Isolation Engine & Solver

None (All connections healthy)
Root Cause & Isolation:

All primary and secondary network links are operating within nominal specifications.

Operational Impact & SOP Action:
  • Dual-redundancy healthy: Highline AP active with LTE standby.
  • TOS and ABB OCR transactions relaying in real time.
Primary Yard Access Point: ONLINE (PRIMARY)
LTE Cradlepoint Link: STANDBY / HEALTHY
Cisco Core Switch: LINK ACTIVE
ABB OCR Server Host: PROCESSING JOBS
PoE Injector Bus: POWER DELIVERED
OCR Cameras: CAPTURING (ISO)
Matchmaker Cameras: ACTIVE (QR READ)

Active Crane Ticket Log

Shift Action History

Time Crane Measures Recorded Action
No crane actions logged yet.